Project Description
This award-winning project included construction of an 87,000 SF elementary school and a 128,000 SF middle school, located on a rapidly expanding campus. The biggest safety challenge with this project was an underground gas line located between the two job sites.
Apollo Elementary School Features a gymnasium with wood floor, bleachers and rock climbing area; see-through stage area; highly reinforced storm shelter; two large playgrounds; and over one mile of roads and utilities.
Eisenhower Middle School Features two gymnasiums, four locker rooms and concession areas; two storm shelters; gas-fired rooftop units; media center with radius wall; music, band, chemistry and home ec. classrooms; and irrigated sports fields and landscaping.
Array
(
[Award Description] => Array
(
[0] => National Associated Builders and Contractors (ABC)
[1] => Associated Builders and Contractors (ABC)
)
[Award Title] => Array
(
[0] => 2010 "Excellence in Construction"
[1] => Nominated for 2010 National "Excellence in Construction" Awards
)
[_rc_cwp_write_panel_id] => Array
(
[0] => 6
)
[_aioseop_keywords] => Array
(
[0] => Goddard Schools, Goddard Kansas, Goddard KS, Wichita Kansas, Wichita KS, Straub Construction, Straub Construction Company, General Contractor, General Contractor KS, General Contractor Kansas, School Contractor, school construction, School builder, Eisenhower, Apollo
)
[Construction Type] => Array
(
[0] => New Construction
)
[Owner] => Array
(
[0] => Goddard USD #265
)
[cft_group_fieldset3] => Array
(
[0] => 2
)
[Architect] => Array
(
[0] => Gossen Livingston Associates, Inc., Wichita, Kansas
)
[Completion Date] => Array
(
[0] => May 2010
)
[City/State] => Array
(
[0] => Goddard, Kansas
)
[cft_group_fieldset2] => Array
(
[0] => 1
)
[_aioseop_title] => Array
(
[0] => Goddard Schools
)
[cft_group_fieldset1] => Array
(
[0] => 1
)
[Location] => Array
(
[0] => S. 167th St. West and 201 S. Main Goddard, KS
)
[_aioseop_description] => Array
(
[0] => This project included construction of an 87,000 SF elementary school and a 128,000 SF middle school, located on a rapidly expanding campus. The biggest safety challenge with this project was an underground gas line located between the two job sites.
Apollo Elementary features a gymnasium with wood floor, bleachers and rock climbing area; see-through stage area; highly reinforced storm shelter; two large playgrounds; and over one mile of roads and utilities.
Eisenhower Middle has two gyms, four locker rooms and concession areas; two storm shelters; gas-fired rooftop units; media center with radius wall; and irrigated sports fields and landscaping.
)